Thursday 28 November 2013

PROJECT 6 : USM AMPHITHEATER STAGE

PROJECT 6


For project 6 we need to do in group of 16 members from 7 discipline that is form architect, quantity surveying, building surveying , construction manager , building technology , urban planning and interior design.
This is our logo n its name is "Heptax".

This is the drawing of the design concept

This is the key plan , location plan and site plan of our amphitheater stage and its orentation . we olso need to do site visit to investigate about the wind and sun direction, wheather, topography and surrounding enviroment.




This is the final outcome of our design. This is the blueprint  and perspective drawing of the amphitheater.
We are using the following material for making the actual amphitheather stage:-

Roof/Side wall
-metal clad for outside finishing
-timber for glulam
-timber board for inside finishing

Backwall
-Galss for rose window/stained glass
-Lead for fram

Backsupport (the 'X' frame)
-timber


Finally this is the result from the our hardworking for 2 weeks and i'm proud of it because we make it together. From these project i learned many things such as working in group and other else.

I like our stage in the dark place. haha.